PlanCheck · AI plan review

Pass plan review
before you submit.

Upload a permit set and select the jurisdiction. PlanCheck returns cited findings, a clear checklist, and a report ready for the next step.

PlanCheck· reviewing set · rev C12 domains
OBJEGRESS · A-201 — travel distance 262 ft exceeds 250 ft max
CLEAROCCUPANCY · A-101 — occupant load within limits
OBJACCESSIBILITY · A-401 — door clearance 30 in below 32 in min
▤ Notice of Objections · 2 findingsPDF · XLSX ready
How it works

Three steps to a clean submission.

Set in. Cited findings out. Keep the review and the next action clear.

01Upload
Add the permit set
PlanCheck reads the drawings, schedules, and specifications across the full package.
02Select
Choose the jurisdiction
Apply the model code and local requirements that matter to the submission.
03Review
Get cited findings
Review a clear report with the code section and drawing detail behind every issue.
Coverage

Every code that matters.

Zoning & use
Occupancy & area
Egress & exiting
Fire & life safety
Accessibility
Structural
Mechanical
Electrical
Plumbing
Energy
Site & civil
Building envelope
For plan review departments

Clear the backlog. Keep the judgment.

Use PlanCheck for the cited first pass so examiners can focus on the decisions that need human judgment.

Consistent every time
The same complete review on every submission, regardless of reviewer, volume, or day of the week.
Faster turnaround
A first-pass Notice of Objections in minutes, so applicants get feedback in a cycle instead of a season.
Defensible findings
Every objection cited to the code section and the sheet — an audit trail that stands up to appeal.
For expeditors & applicants

Fix it before submission.

Review the set before it reaches the counter, then resolve the cited issues while they are still inexpensive to fix.

Pre-check before submission
See the objections a reviewer would raise — egress, occupancy, accessibility, envelope — before the set ever reaches the counter.
Kill the resubmission tax
Each rejection cycle adds weeks. Passing the first time is the difference between opening on schedule and slipping a quarter.
Speak the reviewer's language
Findings cited to code, so your corrections land the first time and your submittal reads clean.
The output

A clear report you can hand over.

Not a chat transcript. A cited, structured record with the detail needed to fix or communicate each finding.

PlanMindsPlanMinds
Notice of Objections
4 objections · 3 cleared
Project
Waterfront District — Building C
Address
480 Harbour Way
Permit #
BP-2026-04417
Code edition
2021 IBC · 2021 IECC
Reviewed
Jul 06, 2026 · 4 min
By
PlanCheck AI
#DomainSheetCode §FindingStatus
01EgressA-201IBC 1017.2Common path of travel 118 ft exceeds 100 ft maximum for Occupancy B.Objection
02AccessibilityA-401IBC 1010.1.1Clear door width 30 in below 32 in minimum at unit entries.Objection
03Fire & Life SafetyA-301IBC 708.31-hour corridor separation not indicated at Level 2.Objection
04EnvelopeA-501IECC C402.1.4Curtain-wall assembly U-factor not scheduled.Objection
05Occupancy & AreaA-101IBC Table 1004.5Occupant-load calculation verified.Cleared
06Zoning & UseC-100§12.10FAR 2.4 within 2.5 permitted; setbacks conform.Cleared
07StructuralS-200IBC 1604.3Lateral system and deflection limits documented.Cleared
Every finding cited to the code section and sheet · Exported as PDF + XLSX · Representative sample.
See it on a real set

Stop guessing. Start passing.

Bring a real set to a demo and see the code review, cited findings, and report in one workflow.